Layout for the panels has been finalised and the factory has confirmed that this is acceptable and will not compromise the efficiency of the system in any way.
Paul from Carbon Energy Solutions is on site now attaching the threaded bar into the gable end of the building. This should be finished today whereupon the rending can continue tomorrow as discussed.
The panels have arrived safely on site and the pallet with the thermodynamic block, fixing brackets and copper distributor pipework will follow later today.