Works to remove the existing roof coverings got underway this week, inevitably the dry weather of the previous weeks was in retreat. As described in last weeks report the existing slating, battening and felt had to be removed and insulation board installed between the rafters.
Although a couple of days was lost to rain good progress was made with the in roof PV panel being installed.
With the new windows now in place the installation of the Spacetherm wall boarding commenced. The first room to be tackled was the dining room, whilst this is a high performance material it is also dusty when handled and worked. As suspected this was a relatively slow process and great care was taken to keep dust levels to a minimum.
Reinstatement and decoration of the internal reveals to a number the new windows was also completed.