Works to remove the existing roof coverings got underway this week, inevitably the dry weather of the previous weeks was in retreat. As described in last weeks report the existing slating, battening and felt had to be removed and insulation board installed between the rafters.
Although a couple of days was lost to rain good progress was made with the in roof PV panel being installed.

Reinstatement and decoration of the internal reveals to a number the new windows was also completed.