Monday, 27 September 2010

27th September 2010: Solar Gain Heat Pump Update


Layout for the panels has been finalised and the factory has confirmed that this is acceptable and will not compromise the efficiency of the system in any way.

Paul from Carbon Energy Solutions is on site now attaching the threaded bar into the gable end of the building. This should be finished today whereupon the rending can continue tomorrow as discussed.

The panels have arrived safely on site and the pallet with the thermodynamic block, fixing brackets and copper distributor pipework will follow later today.

Stuart Dixon
Managing Director
Thermal Reflections

1 comment:

  1. The type of floor heating system will depend on the size and shape of the room you're heating, and whether you're installing the floor heating system retrofit or as part of a whole refurbishment project.

    ReplyDelete